Storage & Project Logistics

Received. Stored.Delivered on Schedule.

Component storage, transloading and project logistics for battery storage, data center and renewable energy projects — Gulf Coast laydown, rail and port access, with the cranes to receive, stage and set every load.

Storage & Project Logistics
STRENGTH PRECISION TRUST SAFETY RELIABILITY ENGINEERED EXECUTION COAST TO COAST STRENGTH PRECISION TRUST SAFETY RELIABILITY ENGINEERED EXECUTION COAST TO COAST
What's Included

Storage & Transload Scope

  • Secure laydown yards located in Galveston, + DFW.
  • Wind Farm: Rail head operations is our speciality
  • BESS container receiving, staging and inventory
  • Transformer and switchgear offload and storage
  • Data center equipment receiving — generators, chillers, UPS
  • Wind component laydown: blades, tower sections, nacelles
  • Receiving inspection with photo condition reports
STORE / SPEC
FACILITIES Gulf Coast + DFW laydown yards
ACCESS Port, rail siding and heavy haul
CAPACITY BESS containers to 300,000-lb transformers
TRACKING Serial-level inventory + photo reports
CRANES Offload and set by Apex Crane crews
Chain of Custody

One Contract. Zero Handoffs.

On most projects, a component crosses four companies between the fabricator and the foundation — and every handoff is a gap where damage, delay and paperwork disappear into finger-pointing. We close every gap because we never let go.

The usual way
Freight forwarder▸ handoff3PL yard▸ handoffHeavy hauler▸ handoffCrane contractor
4contracts
3handoffs
3blame gaps

Four scopes, four insurance certificates, four schedules to reconcile — and when a transformer shows up dinged, your PM plays detective across all of them.

The Apex way
APEX CRANE
1contract
0handoffs
1phone number

We take custody at the port, rail siding or gate and keep it until the component is set on its foundation. One certificate of insurance, one schedule, one call.

What happens

Our cranes and crews take delivery at port, rail siding or our yard. Every component is inspected against the packing list and photo-documented before the carrier leaves.

What you receive

Time-stamped photo condition report and signed receiving record — in your inbox the same day.

Risk that dies here

Concealed transit damage. Damage found now is the carrier's claim. Damage found at the site six months later is yours — unless someone documented arrival. We do.

What happens

Components go onto engineered laydown — Gulf Coast or DFW — with dunnage, weather protection where the spec calls for it, and every serial number logged.

What you receive

A live inventory manifest: what's on hand, where it sits, and its condition — available on request at any point in storage.

Risk that dies here

Lost and mis-stored components. A BESS container parked in the wrong row costs you a crew standing around. Serial-level tracking means the right unit ships the first time.

What happens

As your erection schedule firms up, we sequence loads to match it — nothing lands on site before you're ready for it, nothing arrives out of order.

What you receive

A staged load-out plan tied to your construction schedule, updated when your schedule moves — because it will.

Risk that dies here

Site congestion and re-handling. Every component set down twice is paid for twice. Sequencing off your schedule means it's touched once.

What happens

Rail-to-truck, port-to-truck or yard-to-trailer — our crews handle rigging and securement, and we coordinate permits, escorts and routing for the heavy haul to site.

What you receive

Securement documentation and the full permit package — you never chase a state DOT office.

Risk that dies here

The freight-claim dead zone. When the yard blames the hauler and the hauler blames the yard, you pay. Same company on both ends of the lift — there is no one to blame but us, so nothing to dispute.

What happens

Components arrive in the order your schedule calls for, on the date your crew is ready to receive them — just-in-time, not just-whenever.

What you receive

Signed proof of delivery reconciled against the original receiving report — same photos, same serial numbers, closed loop.

Risk that dies here

Schedule slip from missed windows. A crane crew waiting on a late transformer burns thousands an hour. Delivery is driven by your erection calendar, not a dispatcher's convenience.

What happens

The part every other logistics provider hands off: our NCCCO operators and cranes receive the load at site and set it on the foundation. Custody ends where the project begins.

What you receive

Lift completion record closing the chain — fabricator to foundation, one paper trail, one company signed to all of it.

Risk that dies here

The final handoff. A 3PL's liability ends at the truck gate — the riskiest hundred feet of the journey is someone else's problem. Ours ends when the component is set. That's the difference a crane company's yard makes.

Storage That Ships On Time

Let's Take Delivery.

Tell us what is coming — BESS containers, transformers, generators or wind components — and when your site needs it. We will handle everything in between.

Request Storage & Logistics Quote →